Replatforming without losing traffic or sales
The real eCommerce migration checklist: redirects, data, catalog freeze, and the three weeks after launch that almost nobody plans for.
A botched migration doesn't show on launch day. It shows three weeks later, when organic traffic is down 40% and nobody can explain why. This is the process we follow so that doesn't happen.
Before touching anything: the URL inventory
The first task is never design. It's pulling every URL that currently has traffic or links:
- Full Search Console export (last 16 months, not 3).
- A crawl of the current site, so you have the real structure and not the one you think you have.
- Top pages by sessions in Analytics.
- Backlinks: which external URLs point at your site.
Cross-referencing those gives you the master list. Everything on it needs a destination on the new site — not a generic /, but its equivalent.
The redirect map
A 301 to the homepage preserves nothing. That's the classic mistake and the most expensive one. Every old URL must point to its closest equivalent:
/product/hex-bolt-m8 -> /products/hex-bolt-m8
/category/fasteners -> /categories/fasteners
/blog/how-to-pick-a-bolt -> /blog/how-to-pick-a-bolt
/cart-page -> /cart
URL templates change between platforms, so this is almost always solved with pattern rules plus a list of exceptions. What you can't do is improvise: the list gets tested with a crawler before you point DNS.
The data that breaks quietly
Products and images almost always migrate fine. What breaks silently:
- Customers and passwords. Hashes are rarely portable. You migrate the customer and trigger a reset flow; if nobody is told, the first login fails and the sale is gone.
- Order history. Decide whether it migrates or lives read-only somewhere. For B2B you almost always have to migrate it: reordering depends on it.
- Reviews. Usually in a third-party app and needing their own export.
- Active coupons. The ones people are using right now.
- Subscriptions and recurring payments. Plan these with the gateway from day one, not on launch week.
The freeze
Time passes between the last data dump and the DNS switch, and during that time the old store keeps selling. Two honest options: freeze catalog changes for a few hours, or run a final delta of orders and customers. Pick one and tell the ops team, because "I thought we didn't have to update prices there anymore" is the number one source of post-launch chaos.
Switch day
- Lower the DNS TTL to 300 seconds 48 hours ahead.
- Final delta of orders, customers and inventory.
- Switch DNS during a low-traffic window.
- Verify checkout with a real purchase, on a real card.
- Confirm transactional email is arriving (don't assume SPF/DKIM on the new domain).
- Check that analytics and pixels are firing.
The next three weeks
This is where SEO is won or lost, and it's the part almost nobody budgets for:
- Daily monitoring of crawl errors in Search Console.
- Review of top URLs: indexed, redirected or broken?
- Weekly comparison of organic sessions against the same period last year, not against last week.
- Fixing redirects that slipped through (something always slips through).
A 10–15% dip in the first two weeks is normal while search engines reprocess. A 40% drop that hasn't recovered after a month isn't normal — it's an incomplete redirect map.
What to expect on timing
A B2C migration with a mid-size catalog takes 4 to 8 weeks. With B2B, an ERP and customer-specific pricing, 10 to 16. The timeline is almost never set by design; it's set by data and integrations.
Replatforming this year? Tell us where from and where to and we'll tell you which parts of your case are the risky ones.
Got an eCommerce project in mind?
Tell us what you want to build or fix. You get a direct answer — no endless forms, no sales layers in between.
get a quote